Long before you moved into your home at Donovan, the construction process involving numerous
craftsmen and hundreds of different materials was underway. We believe that the homeowner
should be aware of some of the interesting processes that went into each home.
Variations
Products used during the construction process may change due to circumstances beyond the
Developer’s control. For example, variations in products may occur as a result of
supplier/assembly line changes, industry changes, and procurement changes. In all instances, as
required by your purchase agreement, any substitution of method or product shall be of equal or
better quality than the original specification. These changes may lead to variations within the
same type of unit.
Variations within the same type of unit will also occur if the purchaser elected to pay for an
upgrade option.
Quality Assurance Program
The Developer strives to produce the highest possible caliber of home. The Developer’s “Quality
Assurance Program” places company representatives on-site during the construction process to
review every stage and report on any deficiencies they may find. The goal of this program is to
identify problems before they are passed over to the next stage in construction. The “Quality
Assurance Program” endeavors to minimize deficiencies present at the time your take possession
of your new home.
Delivery Date
The delivery date for your home (the date the unit is transferred from the Developer to the first
homeowner) begins as an estimate. Until components are completed and the structure is
enclosed, this delivery date can be dramatically affected by weather conditions and the availability
of labour and materials. Even after the home itself is past weather-related delay potential, the
installation of utility services, final grading, concrete flatwork, etc. can still affect the delivery date.
City occupancy permits are acquired once these elements are complete. Please understand that
the trades are as eager as you to get caught up and deliver your home on time.
** Depending on availability of labour and materials, weather conditions, site conditions and the
construction process, some homes may not be completed by their scheduled delivery dates **